Tag: new construction

  • Building in Lake Conroe vs Buying an Existing Home

    Building in Lake Conroe vs Buying an Existing Home

    Start with the lot, not the house. Compare each candidate lot’s land price plus verified site work, utilities, permits, financing, and construction against a comparable existing home. Waterfront, golf-community, and inland lots can land far apart. Confirm flood status, sewer or septic, and deed rules before you commit, then run the full numbers with me.

    Is it worth buying or building in Lake Conroe?

    Building in Lake Conroe is worth it when the lot is verified, your budget covers far more than the house itself, and you want a home built to your own plan. Buying an existing home is usually the cleaner path when you want a known price and a faster move. Neither is automatically cheaper. The lot decides it, because floodplain status, sewer or septic, access, and permits change from one Lake Conroe parcel to the next.

    Key Takeaways

    • Neither option is automatically cheaper at Lake Conroe, because land, site work, utilities, permits, financing, and construction timing change the build total lot by lot.
    • In unincorporated Montgomery County, a development permit is generally required for construction, grading, clearing, dredging, and filling, whether or not the lot sits in the floodplain, unless an exemption applies.
    • Structures in or within 100 feet of the Area of Special Flood Hazard must be elevated at least two feet above Base Flood Elevation, with an elevation certificate from a licensed surveyor or engineer.
    • A property within 2,075 feet of Lake Conroe needs an SJRA permit as proof of sewer, and if public sewer is unavailable the owner must apply for a septic permit.
    • Confirm flood status, utilities, access, and deed restrictions before you make a lot purchase contract noncontingent.

    Is Building in Lake Conroe cheaper than buying an existing home?

    Not automatically. A build can come in above or below an existing home, and you won’t know which until you price the specific lot.

    An existing home’s price is one number. A build is a stack of them. In my experience, buyers who compare only the list price of a finished house to a builder’s base price end up surprised. Here is what belongs in a build budget:

    • The land. The lot purchase price itself.
    • Site work. Clearing, grading, fill, driveway, culverts, and drainage. In Montgomery County, development includes construction, grading, clearing, dredging, and filling, so site prep alone can trigger a permit.
    • Utilities. Water, electric, and either a sewer connection or a septic system.
    • Permits and approvals. County permits, plus any subdivision or association review.
    • Professional work. Survey, plans, engineering, and an elevation certificate where one is required.
    • Financing. Construction financing can work differently from a standard mortgage, so talk to your lender before you shop for lots.
    • Construction. The build itself, plus room in the budget for changes.

    Montgomery County also states that a permit is required for development whether or not the property is in the floodplain, unless an exemption applies. An inland lot is not a permit-free lot.

    How do I compare a build to an existing home?

    I walk my clients through a side-by-side. On one side: land price plus verified site, utility, permit, financing, design, and construction costs. On the other: the purchase price of a comparable existing home, plus whatever updates it needs. I pull the existing-home comparables from the MLS. The build side comes from your survey, utility confirmation, and written bids from a builder and a site-work contractor.

    I won’t hand you a generic “build premium,” because no honest one exists for this lake. Your number depends on the lot, the plan, and the timing. That is where a personalized comparison with me comes in.

    Why does an existing home often win on certainty?

    With an existing home, you see the finished product, you know the price, and an inspection tells you the condition. A build gives you a custom plan and new systems, but more of the cost is unknown until bids and permits are in. If you are weighing a builder’s finished home against a custom build, my post on new construction at Lake Conroe pros and cons covers that trade-off.

    One more point on value. Don’t build far above what the surrounding homes sell for. A home specified well past its street may not earn that spend back at resale.

    How do waterfront, golf-community, and inland lots compare for building?

    They differ mostly in flood exposure, sewer or septic feasibility, and the rules attached to the lot. Each of those can change both cost and schedule. Here is what to check on each type.

    Lot typeFlood and elevation questionsSewer or septic questionsRules to get in writing
    WaterfrontFEMA flood zone and floodway status; elevation rule if in or within 100 feet of the Area of Special Flood HazardSJRA sewer proof; septic cannot be located in a floodplainDock and shoreline approvals, retaining or erosion work, construction access
    Golf-communityFlood status and any added drainage requirementsActual tap or connection requirementsArchitectural review, setbacks, construction hours, association charges, golf-course setback limits
    InlandFlood risk is not ruled out by distance from the water; permit still appliesPublic sewer availability or septic feasibilityRoad access, culverts, driveway permit, drainage, deed restrictions

    What do I check on a waterfront lot?

    The questions go well beyond the shoreline. Montgomery County requires structures in or within 100 feet of the Area of Special Flood Hazard to be elevated at least two feet above Base Flood Elevation, verified by an elevation certificate. That affects your design, your foundation, and your budget.

    Work in the 100-year floodplain needs a permit, and the county’s residential-structure guidance applies floodplain review to properties within 100 feet of the floodplain or floodway. Add erosion or retaining work, dock approvals, and equipment access, and a waterfront build is a different project from an inland one. For more on that segment, read waterfront homes in Lake Conroe and who to trust.

    What do I check on a golf-community lot?

    A lot in a golf community such as Bentwater or April Sound may have established roads and nearby utilities. That can simplify the build. But confirm the actual tap or connection requirements, the architectural-review process, setbacks, construction-hours rules, and mandatory association charges. Those terms are specific to each subdivision. Get them from the governing documents and the association, not from the listing.

    What do I check on an inland lot?

    Inland does not mean simple. Montgomery County applies development permitting whether or not a lot is in the floodplain. Inland lots can also come with the longest list of unknowns: road access, culverts, drainage, and whether public sewer reaches the property at all.

    What should you verify before buying a lot or setting a build timeline?

    Start with jurisdiction. A Lake Conroe address may be in unincorporated Montgomery County or inside a municipality. The permitting office, development rules, utility provider, and drainage requirements can differ, so confirm which one governs your parcel before you rely on any county guidance.

    Then verify these items before you remove contingencies on a lot:

    1. FEMA flood-zone and floodway status, and whether your building site is within 100 feet of the Area of Special Flood Hazard.
    2. Required finished-floor elevation and whether an elevation certificate is needed.
    3. Public water and sewer availability, connection requirements, and capacity.
    4. If sewer is unavailable, whether the lot can support an approved septic system.
    5. Road access, culvert and driveway requirements, drainage, and emergency access.
    6. Deed restrictions, architectural-control approval, minimum dwelling size, setbacks, outbuildings, docks, and short-term-rental limits.
    7. Any subdivision, golf-community, waterfront, or homeowners-association assessments and construction rules.

    Sewer is the item I see buyers skip most. If a property is within 2,075 feet of Lake Conroe, the county’s residential-structure permitting guidance calls for an SJRA permit as proof of sewer. If public sewer isn’t available, you apply for a septic permit. The county says the septic permit and development permit must be obtained together, and a septic system cannot be located in a floodplain. A lot that can’t support septic is a very different purchase. For a deeper walkthrough, see what to verify before choosing Lake Conroe land.

    How long does it take to build at Lake Conroe?

    It depends on the lot, the plans, and the approvals, so I won’t give you a generic number. A realistic schedule includes:

    • Due diligence, survey, and soil or septic evaluation
    • Architectural and engineering work
    • Subdivision or association approval
    • Floodplain review, where it applies
    • Development and septic permits
    • Utility coordination and site preparation
    • Construction, inspections, and final documentation

    Watch the clock if you plan to clear or grade before the house starts. Montgomery County says that if construction does not begin within 180 days, a non-structure permit may be required for grading, clearing, filling, or other disturbed-area work. Also, the county requires a separate permit for each structure or addition, including anything with a roof and at least one wall or a carport, so plan for a detached garage or boathouse early.

    If you end up leaning toward a builder-built home, use my new construction on Lake Conroe buyer checklist before you sign anything.

    Building in Lake Conroe pays off when the numbers are tied to a real lot, not a general rule of thumb. If you tell me your price range and the kind of lot you’re considering, I’ll help you build a side-by-side with an existing home before you spend a dollar on a survey.

    Want to see how I work with clients? Read my reviews on Google, Zillow, and Realtor.com.

    FAQ

    Is it cheaper to buy an existing home or build near Lake Conroe in 2026?

    Neither is cheaper by default. The answer depends on the lot, because land price, site work, utilities, permits, financing, and construction all vary by parcel. I compare each candidate lot against a comparable existing home from the MLS so you can see the real difference.

    What extra costs should I expect when building on a Lake Conroe lot?

    Expect costs beyond the house itself: site work, utility connections or a septic system, permits, survey, design and engineering, financing, and any association charges. Floodplain lots may also need an elevation certificate. Get written bids for your specific lot rather than relying on a general estimate.

    Do waterfront lots near Lake Conroe require special floodplain or elevation permits?

    Often, yes. Work in the 100-year floodplain requires a permit, and Montgomery County requires structures in or within 100 feet of the Area of Special Flood Hazard to be elevated at least two feet above Base Flood Elevation, with an elevation certificate. Confirm your lot’s flood status before you buy.

    How do I know whether a Lake Conroe lot has public sewer or needs septic?

    Ask the utility provider and the county before you buy. For property within 2,075 feet of Lake Conroe, the county calls for an SJRA permit as proof of sewer. If public sewer is unavailable, you must apply for a septic permit, and septic systems cannot be located in a floodplain.

    Can I build anywhere on a Lake Conroe waterfront property?

    No. Floodplain and floodway limits, required elevation, drainage, septic feasibility, setbacks, and deed restrictions can all narrow where a home can go. Dock and shoreline approvals are a separate step. Verify the buildable area with a survey and the governing documents before you commit.

    About Lisa Marie Sanders

    With expertise in buying, selling, and investing across the greater Houston metro, Lisa brings a full-service approach to every client, from first-time buyers to seasoned investors. She is part of Living Vogue Real Estate Group.

    Living Vogue Real Estate · 281-900-9663

    Ready to compare a specific lot to an existing home? Call me at 281-900-9663 or search homes to start the comparison.

    Equal Housing Opportunity. Lisa Marie Sanders, TX Broker, Living Vogue Real Estate, regulated by the Texas Real Estate Commission (TREC); see the TREC Information About Brokerage Services notice. We comply with the federal Fair Housing Act and do not discriminate on the basis of race, color, religion, sex, disability, familial status, or national origin. This article is general information, not legal, tax, or financial advice. Confirm your own numbers with your title company, tax advisor, or lender.

  • New Construction in League City, First-Time Buyer Steps

    New Construction in League City, First-Time Buyer Steps

    Start with a lender pre-approval that covers options, taxes, and insurance, not just the base price. Then compare builders on paper, check the community’s plans and flood status, and schedule private inspections during the build. The signed contract is the only promise that counts, so read every page before you sign.

    What Should First-Time Buyers Do Before Buying New Construction in League City?

    New Construction in League City goes best when you work in order. Get pre-approved for the full projected price, compare builders on written specifications, check the community’s plans and flood status, and bring in an independent inspector at key build stages. Do those four things before you sign and you’ll know what you’re buying, what it really costs to own, and what happens if the schedule slips.

    Key Takeaways

    • Ask your lender to underwrite the full projected purchase, including lot premium, options, taxes, insurance, and HOA assessments, because the advertised base price is only the starting point.
    • League City’s own inspection sequence for a new single-family home covers foundation, frame, rough-in, utilities, and final stages, but it is a code-compliance process and does not replace your private inspector.
    • For post-tension foundations, the city replaces the standard foundation inspection with an engineer-provided certification or passed-inspection report, so ask the builder for that document.
    • Texas school districts must provide a $140,000 residence-homestead exemption, but you have to qualify and apply through your appraisal district. A new build does not receive it automatically.
    • A builder’s statement that a home is “not in a flood zone” is not a substitute for checking the official FEMA map and getting insurance guidance.

    How Do You Set a Realistic Budget for a New Build?

    Get pre-approved first, then ask your lender to underwrite the full projected purchase, not the advertised base price. I tell every buyer to get pre-approved, and on a new build it matters even more. The number you qualify for decides which communities and floor plans are realistically on the table.

    What belongs in the full price of a new build?

    The base price rarely tells the whole story. Build your budget from every line below, and ask the sales office to put each one in writing:

    • Base price of the floor plan
    • Lot premium
    • Structural options
    • Design upgrades
    • Estimated property taxes
    • Homeowners insurance, and flood insurance if it applies
    • HOA assessments
    • Any reserves your lender requires

    I walk my clients through this list before we tour a single model. It keeps the model home from setting a number your budget can’t support. Remember that the model shows upgrades. Confirm which items are optional.

    Should you use the builder’s preferred lender?

    Compare before you decide. A builder’s preferred lender may offer incentives, but you should line those up against written loan estimates from at least one outside lender. Look at the complete terms and conditions, not just the headline incentive. Also ask whether the contract requires or rewards the use of a builder-affiliated lender or title company.

    How do property taxes and the homestead exemption work on a new build?

    The exemption isn’t automatic. The Texas Comptroller says Tax Code §11.13(b) requires school districts to provide a $140,000 residence-homestead exemption, and a taxing unit may also adopt a local-option exemption of up to 20% of appraised value. It applies to a qualifying principal residence, and you apply through your appraisal district.

    New construction can be assessed differently depending on the appraisal cycle. It may be valued as land, as partially completed construction, or as a finished residence. The Comptroller’s homestead exemption guidance explains that a homestead is generally the house and land you use as your principal residence on January 1. If you buy later in the year, you may qualify for the applicable part of that tax year when the prior owner did not receive the same exemption. Confirm the property’s appraisal status and your filing steps with the appraisal district, and get projected tax figures from them and your lender.

    How Do You Choose a Builder and Community for New Construction in League City?

    Compare builders on written specifications, not on how the model home looks, and then check the community against public records instead of sales-office promises. Every builder’s paperwork looks polished. The differences show up in the details.

    What should you ask every builder for?

    • The standard-included-features list and the upgrade price sheet
    • The construction timeline and the language on completion delays
    • Warranty terms
    • Cancellation and default provisions
    • Change-order rules
    • Any required use of the builder’s title or mortgage affiliates

    Put the same questions to two or three builders and lay the answers side by side. A verbal promise from a sales representative does not change the signed contract. If it matters to you, it belongs in writing. Your contract will be closed through a title company, so ask who that will be and whether you can choose your own.

    How do you vet a community before you commit?

    Start with the public record. The City of League City describes its Development Review Committee as a multi-department group that reviews development plans for compliance with city codes and regulations. That is a better source for what is actually planned than a builder’s amenity or infrastructure timeline alone.

    Then review the subdivision information:

    • Planned phases and what sits next to your lot
    • Road and drainage infrastructure
    • Utility providers
    • HOA documents
    • When amenities are scheduled to open, and where that promise is written down

    The city’s permits page and Building Department page point to an online portal where you can search permits, track status, and locate projects occurring in neighborhoods. Records have limits, but it is worth a look before you commit to a section.

    What code standard governs a new League City home?

    League City enforces the 2021 International Residential Code for residential construction. That gives you a baseline question for the builder: which code version governs your permit, and which features go beyond code minimums rather than just meeting them?

    How do you check flood and drainage on a new-construction lot?

    Verify it yourself. Check the property’s FEMA flood-zone status on the official FEMA map, and ask for the finished-floor elevation and the drainage design. Then ask your lender and insurance agent whether flood insurance will be required. A builder saying a home is “not in a flood zone” is not a substitute for any of that. For a waterfront or coastal lot, my waterfront buying steps go deeper on this.

    What Happens Between Contract and Closing on a New Build?

    Your home moves through a series of city inspections while you run a separate set of private checks. League City lists a typical sequence for new single-family construction, though it can vary by project. Here is how it lines up with what you should request:

    Build stageWhat the city process coversWhat to ask for
    FoundationFoundation inspection. For post-tension foundations, an engineer-provided certification or passed-inspection report replaces it.The builder’s foundation documentation and the engineering report that applies to your home
    Frame and rough-inFrame, rough mechanical/electrical/plumbing, and exterior-envelope inspectionsA private pre-drywall inspection before the walls close
    Utilities and siteWater/sewer taps, gas, electrical meter, site, and final utility inspectionsConfirmation that each one has passed
    FinalFinal building and mechanical/electrical/plumbing inspectionsFinal survey, elevation certificate, energy report, warranties, and manuals

    That sequence comes from the City of League City’s new single-family construction page.

    Do you need your own inspector on a new build?

    Yes, consider one. The city’s inspections are a municipal code-compliance process. They don’t replace your private inspection or your warranty review. Hire an independent inspector for three points: the foundation stage, pre-drywall, and the final inspection. For a post-tension foundation, ask the inspector and the builder how cables, penetrations, and future repair work should be documented.

    What should you have in hand before closing?

    Confirm that required permits and final inspections are complete. The city lists final survey/elevation and final energy documentation among the items needed before final inspections can be scheduled, per the same city page. Before closing, make sure the builder has delivered everything your contract promises, including the survey, elevation certificate, energy report, warranties, manuals, and any required certificates or approvals.

    Permit charges are a separate issue. The city publishes a building department fee schedule covering building and plan-review fees and reinspection fees. Those are municipal charges, not your total cost. Your contract should say whether the builder or buyer pays permit-related charges, change-order costs, utility connection charges, and reinspection expenses.

    How should you handle the final walkthrough?

    Schedule it only when the home is substantially complete and you’ve received the inspection and warranty documents. List every incomplete or damaged item in a written punch list. Then confirm in writing how and when unfinished items will be handled after closing. Don’t assume anything a sales representative said out loud carries the same weight as the contract.

    Not sure which section of your contract matters most, or how to compare two builders’ price sheets? That is exactly the work I do with buyers before they sign. For the earlier steps, my first-time homebuyer steps and what to check first posts cover the groundwork.

    Want to see how other buyers have felt working with me? Read my reviews on Google, Zillow, and Realtor.com.

    FAQ

    Do I need my own buyer’s agent when purchasing new construction in League City?

    You aren’t required to have one, but the builder’s sales representative works for the builder, not for you. An agent of your own can help you compare builders, read the contract, and keep the process organized. Builder registration policies vary, so tell the sales office up front if you’re working with an agent. Broker fees are fully negotiable and not set by law, and any compensation arrangement should be agreed in writing before you tour.

    Should I use an independent home inspector during new construction?

    Yes, consider one at the foundation stage, pre-drywall stage, and final inspection. The city’s staged inspections check code compliance but do not replace a buyer’s private inspection or warranty review. An independent inspector gives you a written record you can take to the builder.

    How do I find out whether a new-construction home needs flood insurance?

    Check the property’s FEMA flood-zone status on the official FEMA map, then ask for the finished-floor elevation and drainage design. Your lender and insurance agent will tell you whether flood insurance is required. Don’t rely on a builder’s verbal statement that the home is outside a flood zone.

    When should I apply for the Texas residence-homestead exemption after buying a new build?

    Apply once you qualify, meaning the home is your principal residence, by contacting your county appraisal district. The exemption is not granted automatically just because the home is new. The Comptroller notes that a buyer who acquires property after January 1 may qualify for the applicable part of that tax year if the prior owner did not receive the same exemption, so confirm the property’s status and filing requirements with the appraisal district.

    What happens if the builder delays completion or the home isn’t finished by the closing date?

    Your contract controls the answer, so read the completion-delay and default language before you sign. Ask what remedies you have, whether closing dates can move, and what happens to any deposits. Verbal assurances from the sales office do not change the signed document.

    The core of New Construction in League City is simple. Get pre-approved on the full number, put every promise in writing, verify the community and flood status yourself, and inspect at the stages that matter. If you’d like help comparing builders or reading a contract, call me at 281-900-9663. You can also search homes here.

    About Lisa Marie Sanders

    With expertise in buying, selling, and investing across the greater Houston metro, Lisa brings a full-service approach to every client, from first-time buyers to seasoned investors.

    Living Vogue Real Estate · 281-900-9663

    Equal Housing Opportunity. Lisa Marie Sanders, TX Broker, regulated by the Texas Real Estate Commission (TREC). See TREC’s Information About Brokerage Services notice. We comply with the Fair Housing Act and do not discriminate on the basis of race, color, religion, sex, disability, familial status, or national origin. This article is general information, not legal, tax, or financial advice. Confirm your own numbers with your title company, tax advisor, or lender.

  • New Construction on Lake Conroe Buyer Checklist

    New Construction on Lake Conroe Buyer Checklist

    Before you fall for a model home, get pre-approved, then pull the lot’s records and read the full builder contract. Confirm the floodplain status, sewer or septic setup, what the price actually includes, the completion window in writing, and how incentives are conditioned. Those five checks decide your real cost and timeline.

    What should you check before buying new construction on Lake Conroe?

    To buy new construction on Lake Conroe with confidence, review the lot, the contract, and the price sheet as three separate items. The lot decides your floodplain exposure, your drainage, and whether you’ll be on public sewer or septic. The contract decides your timeline and your remedies if something slips. The price sheet decides what you actually pay.

    Key Takeaways

    • Montgomery County requires a development permit for construction, including property outside the floodplain unless a specific exemption applies, so ask the builder for permit status and approved plans.
    • Properties within 2,075 feet of Lake Conroe may require proof of sewer through the San Jacinto River Authority, so confirm whether your home has public sewer, septic, or an SJRA-related requirement before you commit.
    • Montgomery County requires floodplain review for properties within 100 feet of a floodplain or floodway, and elevation certificates may be part of the paperwork.
    • TREC publishes separate New Home Contract forms for completed and incomplete construction, but a builder may hand you its own contract or addenda, so read what you’re actually signing.
    • Any incentive tied to a specific lender, title company, or closing date belongs in writing before you compare it to a lower price.

    I walk my clients through new builds all the time. The glossy brochure rarely tells you what the home will really cost or when you’ll move in. If you want the big-picture view first, my breakdown of new construction at Lake Conroe pros and cons is a good starting point. This post is the checklist for what comes next.

    How do you vet the lot for new construction on Lake Conroe?

    Treat the lot as its own due-diligence item, separate from the house. A beautiful floor plan can’t fix a drainage problem, a floodplain issue, or a septic restriction. Ask for a lot-specific document package before you commit.

    Which jurisdiction and permits apply?

    Start by confirming who has authority over the property. Lake Conroe-area land may fall under Montgomery County processes or a city’s separate permitting system, and some lots sit in an extraterritorial jurisdiction. Identify which office issued the building, floodplain, septic, and utility approvals.

    Montgomery County states that development requires a permit, including construction outside the floodplain unless a regulatory exemption applies. Work within the 100-year floodplain requires one too. So ask the builder to show you the permit, the approved plans, and any outstanding inspections.

    Is the lot in or near a floodplain?

    The county’s guidance calls for floodplain review within 100 feet of a floodplain or floodway. It lists elevation certificates and conformity forms among the materials that may be required. What applies depends on the lot and the proposed construction.

    Montgomery County also lists new floodplain regulations on its permitting pages. If your home was permitted under an earlier process, ask the builder or the permitting office which requirements applied to that project. Then confirm every required document was completed.

    If the lot is lakeside, my post on waterfront homes in Lake Conroe and who to trust covers the extra questions that come with water frontage.

    Will you have public sewer or septic?

    Don’t assume. Properties within 2,075 feet of Lake Conroe may require proof of sewer through the San Jacinto River Authority. Confirm whether the home is connected to public sewer, served by a septic system, or subject to an SJRA-related permit requirement.

    If public sewer isn’t available, the owner needs a septic permit. The county says the development permit and septic permit must be obtained together, not separately.

    Verify the system, not just the existence of a permit. Ask for:

    • The approved site plan
    • Tank and field locations
    • Operating and maintenance requirements
    • Any reserve-area restrictions
    • Confirmation that your planned driveway, pool, landscaping, fencing, and future additions won’t interfere with the system

    For new residential subdivisions using on-site sewage, the county’s subdivision review asks for planning materials covering topography, the 100-year floodplain, soil conditions, water wells, easements, drainage, and the proposed sewage systems. A permit to construct the private sewage facility is required before construction.

    What about drainage and grading?

    Ask where water goes. Find out whether drainage routes cross the lot, whether fill was used, and where swales and retaining walls sit. Ask whether any part of the lot is restricted from building or septic use. If you can, walk the lot after a hard rain and look for standing water.

    Here’s the document package I ask builders for, and what each item tells you:

    DocumentWhat it tells youWhere to ask
    Recorded subdivision platLot lines, easements, and building restrictionsBuilder or title company
    SurveyExact boundaries and where the home sits on the lotBuilder or title company
    Floodplain determination and elevation documentationFlood exposure and whether elevation paperwork appliesBuilder and the permitting office
    Sewer proof or septic permit and site planHow wastewater is handled and what you can build near itBuilder and the permitting office
    Drainage and grading plansWhere water is meant to flow on and off the lotBuilder
    Permit and inspection statusWhether required approvals are completeBuilder and the permitting office

    If the lot sits inside a community such as Bentwater, Grand Harbor, or April Sound, also ask for any association documents and fee schedules before you sign.

    What should the builder contract and price sheet spell out?

    They should spell out the price, the inclusions, the completion window, and your remedies if something goes wrong, all in writing. A sales rep works for the builder. I work for you, so I read these documents with your costs and timeline in mind.

    Which contract form applies?

    The Texas Real Estate Commission lists separate New Home Contract forms for completed and incomplete construction. The right one depends on whether the home is finished and whether anyone has lived in it. For a finished home, TREC’s New Home Contract (Completed Construction), Form 24-20, applies when the builder completed the home and no one has previously lived in it.

    A builder may present its own contract or addenda instead. Don’t assume a sales brochure or incentive sheet contains all the binding terms. Have the actual contract reviewed by a qualified professional before you sign, especially the sections on earnest money, default, upgrades, allowances, warranties, delay, mediation or arbitration, and incentives.

    What’s included, and what’s only available?

    Advertised base prices rarely tell the whole story. Your purchase worksheet should itemize:

    • Base price and lot premium
    • Structural options and design-center selections
    • Appliances and window coverings
    • Landscaping, irrigation, and fencing
    • Gutters and garage features
    • Utility connection charges
    • Any required association or community charges

    If an item is “available” rather than “included,” assume it costs extra until the worksheet says otherwise. Your actual numbers depend on the lot, the plan, and your selections, so this is where we run the figures together.

    How should you weigh incentives against price?

    An incentive can be worth taking, but read the conditions. The agreement should say whether it’s available only through a designated lender or title company, or only with a certain closing date. Compare that against your own pre-approval and a lower purchase price before you decide.

    This is why I tell buyers to get pre-approved before they walk into a sales office. You’ll know your real number before anyone shows you an incentive sheet. My post on how much money you need to buy a house in Lake Conroe helps you plan that conversation with your lender.

    What happens if the build runs late?

    Put construction timing in the contract. Look for the anticipated completion window, permissible extensions, notice requirements, material-substitution rights, change-order procedures, and your cancellation rights. Also look for what happens if financing approval, appraisal, inspections, or completion get delayed.

    Earnest money matters here too. TREC guidance says earnest money is delivered to the escrow agent and generally deposited by the close of business on the second working day after execution, unless the parties agree otherwise in writing. The signed contract controls, so verify the deposit deadline, the refund conditions, and how builder incentives are treated.

    What inspections and closing documents should you get before you close?

    Plan inspections at more than one stage, and confirm the completion paperwork before your closing appointment. A new home can still have defects, and an unfinished punch list can hold up your move.

    Ask the builder about these checkpoints:

    1. Pre-drywall inspection while framing, wiring, and plumbing are still visible.
    2. Drainage and grading inspection once the lot is shaped.
    3. Final inspection before closing.
    4. Independent inspection by an inspector you choose.

    Then check the contract for access rules, repair obligations, deadlines, and whether unresolved items can delay closing. Get these in writing before you sign, not after.

    Before closing, confirm with your title company that required permits, final inspections, utility approvals, surveys, lien-related documentation, and builder warranty materials will be available or addressed. The title company handles the closing process, but the builder’s contract determines many of your obligations and remedies. If this is your first purchase, my first-time home buyers step-by-step guide shows where these checks fit in the full timeline.

    Curious how I work with buyers? Read my reviews on Google, Zillow, and Realtor.com.

    FAQ

    What should I look for in a new-construction contract near Lake Conroe?

    Look for the completion window, extension rights, change-order rules, earnest money terms, warranty language, and exactly what’s included in the price. Check whether the builder is using a TREC New Home Contract or its own form with addenda. Have the document reviewed before you sign.

    How do I find out whether a Lake Conroe lot is in a floodplain?

    Ask the builder for the floodplain determination and any elevation documentation, then confirm with the permitting office. Montgomery County requires floodplain review for properties within 100 feet of a floodplain or floodway. The exact paperwork depends on the lot and the construction.

    Does a new home near Lake Conroe need a septic system or public sewer?

    It depends on the lot. If public sewer isn’t available, the owner needs a septic permit, and Montgomery County requires it together with the development permit. Properties within 2,075 feet of Lake Conroe may also need proof of sewer through the San Jacinto River Authority.

    Are builder upgrades or closing incentives better than a lower purchase price?

    It depends on the conditions attached. Check whether the incentive requires a designated lender, title company, or closing date, and compare it to a price reduction in writing. I’ll help you line up both offers so you can see which one fits your situation.

    What happens to my earnest money if the builder delays completion?

    Your contract decides. Look at the completion window, permitted extensions, notice requirements, and your cancellation rights, plus the refund conditions for earnest money. Get these terms reviewed before you sign, because they are hard to change afterward.

    Ready to review a builder contract or lot?

    The best time to catch a problem with new construction on Lake Conroe is before you sign. Check the lot, read the contract line by line, and get every incentive and date in writing. Send me the builder’s contract, the price sheet, and the lot details, and I’ll walk through them with you.

    Call me at 281-900-9663 or search homes here.

    About Lisa Marie Sanders

    Lisa Marie Sanders of Living Vogue Real Estate Group has expertise in buying, selling, and investing across the greater Houston metro. She brings a full-service approach to every client, from first-time buyers to seasoned investors.

    Living Vogue Real Estate · 281-900-9663

    Equal Housing Opportunity. Living Vogue Real Estate follows all federal, state, and local Fair Housing laws. Lisa Marie Sanders, License: TX Broker, regulated by the Texas Real Estate Commission (TREC). TREC Information About Brokerage Services and the Consumer Protection Notice are available on request. This article is general information, not legal, tax, or financial advice. Confirm your own numbers and contract terms with your title company, tax advisor, or lender.

  • New Construction in Montgomery County, Step by Step

    New Construction in Montgomery County, Step by Step

    To buy new construction in Montgomery County, confirm which jurisdiction governs the lot, review the builder’s contract line by line, schedule independent inspections at set stages, and get every punch-list item in writing before closing. Permits and inspections run through the city or county with authority over the lot. Your contract controls the rest.

    How do you buy new construction in Montgomery County?

    To buy new construction in Montgomery County, confirm which jurisdiction governs the lot, review the builder’s contract line by line, schedule independent inspections at set stages, and get every punch-list item in writing before you close. Permits and inspections run through the city or county with authority over the lot. Your contract controls almost everything else.

    Key Takeaways

    • The City of Montgomery’s permit review takes at least 10 business days, and the real timeline varies with the project’s type and complexity.
    • A Lake Conroe-area lot can sit inside a city or in unincorporated Montgomery County, and permit, inspection, and floodplain procedures can differ between them.
    • A builder warranty is not the same as a home warranty (residential service contract), and the Texas Department of Insurance, not TDLR’s residential service contract program, regulates builder warranties.
    • The most recent Greater Houston report I found, from September 2026, put the single-family median sale price at $330,000, but that is a regional figure and not a Lake Conroe number.
    • Your builder contract, not a sales brochure, defines specifications, allowances, delay terms, and the warranty process.

    Who controls permits and inspections for new construction in Montgomery County?

    It depends on where the lot sits. A Lake Conroe-area property may be inside a municipality such as Montgomery or Conroe, or in unincorporated Montgomery County, and each can run permits, inspections, floodplain review, and development procedures differently.

    I walk my clients through this first, before they fall in love with a floor plan. The answer shapes your timeline and your questions for the builder.

    How do you find out which jurisdiction applies?

    Ask the builder in writing which jurisdiction issues the permits for your lot. Then confirm it with that permitting office yourself. Don’t assume a Lake Conroe address means one set of rules.

    How do you know the builder has pulled permits?

    Ask for the permit number. In the City of Montgomery, a permit is required before construction begins, and the city states that work may not start until required permits are issued. That covers new construction, alteration, repair, and the electrical, gas, mechanical, plumbing, and irrigation work inside it.

    The builder or an authorized agent submits the application with plans, supporting documents, and contractor registration. The city accepts submissions by email, mail, or in person. Review takes at least 10 business days, and complex projects can take longer.

    That matters to you as a buyer. If a builder promises a start date or a move-in date that ignores permit review, ask how they built that schedule.

    How do inspections affect your schedule?

    Inspections can move your completion date. In the City of Montgomery, a request for the next business day generally has to be submitted by noon on the preceding business day, and weekends and city holidays don’t count. Each request must include the property address, permit number, requested date, and preferred time, per the city’s permits and inspections FAQ.

    One missed deadline or one failed inspection can push a stage back. Those delays add up. Other jurisdictions have their own procedures, so confirm the rules for your lot with the office that issues your permit. The City of Montgomery’s Building and Permitting page is a good example of what to look for.

    What about floodplain, elevation, septic, and drainage?

    Ask about them for every lot. Requirements vary by property and by jurisdiction, so I never assume one lot’s answer applies to the next. Ask the builder what applies to your lot, then verify it with the issuing office and your title company.

    What should you review before signing a builder’s contract?

    Review all of it. The contract defines your home, so anything the sales team says out loud needs to appear in writing. Builders differ, and one builder’s process doesn’t carry over to another.

    When you buy new construction in Montgomery County, confirm that the contract spells out:

    • **Construction specifications** and approved plans
    • **Allowances** for flooring, fixtures, and appliances, and what happens when you exceed them
    • **Upgrade pricing** and how selections are documented
    • **Completion and delay provisions**, including what you can do if the date slips
    • **Change-order procedure** and who approves it
    • **Closing conditions**
    • **Warranty process** and how to submit a claim

    Remember that the builder’s sales representative works for the builder. You may want your own representation on your side of the table. I’d rather help you sort out the paperwork before you sign than after.

    How do you keep upgrades under control?

    Look at the surrounding homes before you load the contract with upgrades. Features that push your home well past what’s around it rarely come back to you at resale. Spend where it improves daily living and fits the street.

    For a broader look at the tradeoffs, read my post on new construction at Lake Conroe pros and cons.

    Should you use the builder’s preferred lender?

    Compare before you decide. Get a written loan estimate from the builder’s lender and from at least one other lender. Ask the builder in writing whether any incentive depends on using their lender, then weigh that against the rest of the offer. Verify the terms with each lender.

    What does the market data tell you?

    The most recent Greater Houston report I found, from September 2026, shows a single-family median sale price of $330,000, according to The Conroe Courier. That figure covers the broader region, not Lake Conroe or Montgomery County. Your price depends on the lot, the builder, the floor plan, and your selections. I run those numbers with you before you sign.

    How do you inspect new construction before closing and after move-in?

    Use independent inspections at meaningful construction stages, then document everything before you close. The official sources I reviewed explain public permit and inspection procedures. They don’t set a buyer’s private inspection schedule, so this is the practical process I suggest.

    StageWhat to doWhat to get in writing
    Before drywallArrange an independent inspection while framing and systems are still visibleThe inspector’s report and the builder’s response to each item
    Before closingComplete a final inspection and walkthrough against the contract specificationsA punch-list with each item, the responsible party, and an expected completion date
    After move-inSchedule a warranty inspection before the builder’s punch-list or warranty deadlinesA dated claim submission under the warranty process

    What should you document at the final walkthrough?

    Compare the finished home with the contract specifications and your approved selections. Then:

    1. **Photograph** unfinished or defective work.
    2. **Get the punch-list in writing**, with the responsible party and expected completion date for each item.
    3. **Keep your records**: permits, inspection records, manuals, warranties, and appliance information.

    If it isn’t written down, you’ll struggle to prove it later.

    How is a builder warranty different from a home warranty?

    They are separate products. The Texas Department of Licensing and Regulation says builder warranties generally cover permanent components of a new home, such as flooring, plumbing, or electrical work. Residential service contracts are regulated separately. TDLR also states the Texas Department of Insurance regulates builder warranties, not TDLR’s residential service contract program.

    Ask for the actual warranty document before you sign. Look for notice deadlines, exclusions, dispute procedures, and whether coverage transfers to a later owner.

    You can read what my clients say about working with me on Google, Zillow, and Realtor.com.

    FAQ

    Do I need my own home inspector for a newly built house in Montgomery County?

    Yes, I recommend one. Permit inspections are part of the builder’s process with the jurisdiction, while a private inspector works for you. I suggest an inspection before drywall, a final inspection before closing, and a warranty inspection before the builder’s deadlines.

    What happens if my new-construction home is delayed?

    Your contract’s completion and delay provisions control what you can do. Permit review alone takes at least 10 business days in the City of Montgomery, and failed or rescheduled inspections can add more. When a date slips, get the revised date in writing and check whether it affects your closing, your lender’s terms, or your move.

    What does a builder warranty cover in Texas?

    It generally covers permanent components of the home, such as flooring, plumbing, or electrical work, according to TDLR. Coverage details come from the actual warranty document, so read it for deadlines, exclusions, and dispute procedures. A builder warranty is also different from a residential service contract.

    Should I use the builder’s preferred lender or find my own?

    Compare both. Get a written loan estimate from the builder’s lender and another lender, and ask whether any builder incentive depends on using theirs. Verify the terms with each lender before you decide.

    Are homes near Lake Conroe affected by floodplain, elevation, septic, or drainage requirements?

    It depends on the specific lot and the jurisdiction that governs it. A lot may sit in a city or in unincorporated Montgomery County, and procedures can differ. Ask the builder what applies to your lot, then verify it with the issuing office and your title company.

    Ready to run the numbers on your build?

    Buying new construction in Montgomery County rewards the buyer who asks early about permits, reads the contract closely, and documents everything before closing. I walk you through each step, from builder selection to the warranty inspection, so you aren’t learning the process after you’ve signed.

    Call me at 281-900-9663 or search homes here.

    About Lisa Marie Sanders

    With expertise in buying, selling, and investing across the greater Houston metro, Lisa brings a full-service approach to every client, from first-time buyers to seasoned investors.

    Living Vogue Real Estate · 281-900-9663

    Equal Housing Opportunity. Living Vogue Real Estate supports the Fair Housing Act and equal housing opportunity for all. Lisa Marie Sanders, TX Broker, regulated by the Texas Real Estate Commission (TREC). This article is general information, not legal, tax, or financial advice. Confirm your own numbers and terms with your title company, tax advisor, or lender.